CASE CENTER
Home » CasesCases
Soil remediation project of a former manufactured gas plant in Guangzhou, Guangdong
發(fā)布時(shí)間:2021-8-18 瀏覽量:
Passed inspection in one attempt, all inspectionpoints 100% met RG
Scale of TTZ: 2800m2, 28888m3, max. depth 16m bgs;
COCs: BTEX, PAHs, Dibenzofuran, Total petroleum hydrocarbon;
Remediation Time-frame:2017.07-2018.09;
Remediation Effect: 100% met RG, min. COCs removal rate 99.8%.
COCs | RG (mg/kg) |
Benzene | 0.64(0-8m) |
0.61(8-12m) | |
Naphthalene | 50 |
Benzo (a) anthracene | 0.64 |
Benzo (a) pyrene | 0.2 |